Define an enhancement, explain its value, and document the design, readiness, release requirements, and implementation progress. Use when proposing a significant product or technical change that needs review, staged delivery, and release signoff.
Release signoffTrack the items that must be ready before the change enters a release.
SummaryExplain the change, who benefits, and the expected result in a short paragraph that can inform planning and user communications.
Motivation and scopeDescribe the need and intended benefits.
ProposalDescribe the proposed outcome clearly enough for reviewers to understand the change before implementation details.
Design detailsDocument the design choices and implementation behavior needed to remove ambiguity.
Test planSpecify how the change will be checked at each relevant level, what existing coverage needs updates, and how results will be tracked.
Graduation criteriaList the evidence required at each delivery stage before advancing.
Upgrade and downgrade strategyExplain how existing users and data move between versions, including recovery steps and compatibility limits.
Version skew strategyDescribe which versions can safely operate together, for how long, and what users should expect during transitions.
Production readiness reviewAnswer the readiness questions that apply to this change.
Implementation historyRecord major delivery milestones, dates, and references so reviewers can see what has shipped and what remains.
Drawbacks, alternatives, and infrastructureCapture meaningful tradeoffs, credible options considered, and any additional infrastructure needed to deliver or operate the change.